Manufacturing consulting
Plants are being asked to absorb volume swings, labor gaps and reshoring decisions while holding cost and quality steady. WGA Consulting raises manufacturing throughput, reliability and quality on the shop floor, with senior practitioners who have run plants and stay until results hold.
Supply chain optimization

Why it matters
20+
years deploying Lean and Six Sigma in plants, labs and service operations
$33M
in excess spare parts removed across six pharmaceutical plants
How we help
We start on the floor, on every shift, and work back to the systems, policies and decisions that shape what happens there.
Plant performance diagnostics
Measure OEE, labor productivity, scrap and changeover loss line by line, and size the prize before any capital is committed.
Maintenance and reliability
Move from reactive repair to planned, reliability-centered maintenance, built on CMMS data your planners and technicians trust.
Quality and process control
Cut defects and escapes with SPC, root-cause discipline and quality systems that stand up to customer and regulatory audits.
Changeover and flow
Shorten changeovers with SMED, balance lines and reduce work in process, so plants run smaller lots at lower cost.
Capacity and footprint
Decide where to expand, consolidate or reshore capacity, based on total landed cost, risk and lead time rather than labor rates alone.
Daily management
Install tiered huddles, visual performance boards and leader standard work, and coach supervisors until they run them unaided.
See, stabilize, improve, standardize
Our approach
Four stages, proven on one line before they roll across the plant and the network.
01
See
In two to four weeks we walk the floor on every shift, analyze line and maintenance data, and agree a baseline for OEE, cost and quality.
02
Stabilize
We fix the basics first: maintenance backlog, material availability and standard work, so improvements have a stable process to build on.
03
Improve
We run focused projects on the largest losses, such as changeovers, scrap and unplanned downtime, with your engineers and operators.
04
Standardize
We lock in gains with daily management, control plans and training, then roll the model to the next line or plant.
When to call us
Plant and operations leaders usually bring us in when one of these is true.
- OEE has plateaued and the next increment of output looks like it needs capital.
- Unplanned downtime and maintenance cost are rising as equipment ages.
- Scrap, rework or customer complaints are eroding margin.
- Plants in the same network make the same product at very different cost.
- You are deciding whether to reshore, consolidate or add a site.
- Supervisors spend their shifts firefighting instead of running the line.
Manufacturing consulting client impact
Results from recent plant and operations work. Clients are not named.
98.9%
on-time, in-full delivery, up 29 points
Automotive
Delivery recovered with $500M in contracts at risk
A $19B automobile accessory manufacturer was missing delivery dates as costs ran out of control. WGA resolved the problems in under three months and cut operating costs by more than 32%.
74-81%
equipment uptime, up from 42-51%
Pharmaceutical
Stabilizing four sterile pharmaceutical plants
Supply disruptions traced back to maintenance and spare parts failures. Triage teams stabilized each plant, and an RCP benchmark shaped a three-year maintenance excellence strategy.
40+
functions benchmarked for AI readiness
Packaging and paper
Finding where agents should go first in a paper and packaging business
The AI Workforce Readiness Assessment scored each function across 8 domains and produced a sequenced, value-ranked roadmap.
AI in manufacturing
Agents that give engineers their shifts back
Plant engineers spend hours each week pulling data from MES, CMMS and quality systems to explain what went wrong yesterday. That assembly work can run overnight, so the morning meeting starts with causes rather than questions.
WGA designs AI agents that flag equipment drift, draft maintenance work orders and prepare root-cause analyses for engineers to confirm. Operators and engineers keep the decisions. Agents take the data work.
- Condition alerts that open draft work orders in your CMMS
- Shift handover summaries built from MES and quality data
- First-draft 8D and deviation reports for engineer review
Industries we serve
Our manufacturing consulting covers discrete, process and regulated plants, from machining and assembly to batch chemistry and validated pharmaceutical lines.
Our experts
The senior consultants who would walk your floor and lead the plant work.
Frequently asked questions about manufacturing consulting
How long does a manufacturing consulting engagement take?
A plant diagnostic takes two to four weeks. A first wave of improvements usually runs three to six months per site, and a network rollout runs longer. Every phase has a fixed fee agreed before it starts.
Do we need capital investment to raise output?
Usually not at first. Most plants have output hidden in downtime, changeovers and scrap, and we recover that before recommending new equipment. When capital is needed, we build the case with your finance team.
Will the work disrupt production?
We plan around your schedule. Diagnostics run alongside normal production, and changes are piloted on one line, proven and then rolled out, with operators involved from the start.
Do you work in regulated plants?
Yes. We work in FDA-regulated pharmaceutical and medical device manufacturing, where every change must stay inside validated processes and documented change control.
How do you measure results?
We agree a baseline for OEE, cost per unit, quality and maintenance spend in the diagnostic, and report against it every month. Finance confirms the savings, and the same measures stay on your plant scorecards.
Related insights
Article · September 21, 2026
AI agents in the supply chain, from sensing to settlement
The supply chain runs on exceptions, and exceptions are where AI agents earn their keep. Where agents fit, from sensing to settlement, and how to sequence.
Article · September 22, 2026
AI in pharma quality: meeting the credibility bar
FDA’s draft guidance sets a risk-based credibility bar for AI in pharma quality decisions. What that means for quality operations that want agents.
Article · September 23, 2026
Why transformations stall, and what restarts them
70 percent of large transformations miss their goals, and most stall in recognizable ways. The patterns to look for, and the restart moves that work.
Explore more
Talk to a manufacturing practitioner
Tell us which plant, line or loss worries you most. A senior consultant, not a sales team, will reply.


