Aerospace and defense consulting

Aerospace demand has outrun a supply base still rebuilding capacity, so every late casting now becomes a late aircraft or a grounded fleet. WGA Consulting helps aerospace OEMs, suppliers, MRO providers and defense contractors stabilize supply, raise throughput and deliver programs on cost and schedule.

Industries

Aerospace and defense MRO: an airliner in a hangar at night, engine cowlings open, technicians on a work platform

Who we serve

Each segment runs on different contracts, cycle times and constraints, and we staff to the one you are in.

Commercial aircraft OEMs

Rate ramps on narrowbody and widebody lines, where one short part can stop final assembly and an undelivered aircraft costs the airline every day.

Tier 1 and Tier 2 suppliers

Aerostructures, engine component, casting, forging and avionics makers absorbing labor and material inflation inside fixed-price long-term agreements.

Engine and component MRO

Engine shops, component repair stations and airline maintenance organizations where turn time, parts availability and technician capacity set revenue.

Defense primes and subcontractors

Contractors on fixed-price and cost-plus programs, carrying earned value, cybersecurity and export control obligations into every decision.

Space and launch

Launch vehicle, satellite and space systems companies moving from development hardware to repeatable production at a credible unit cost.

Business and general aviation

Airframers and completion centers managing long, customized build cycles, fixed delivery slots and demanding owner expectations.

Issues leaders face now

The questions we hear most from aerospace and defense executives.

  • Deliveries are capped by the supply base, not by demand: castings, forgings, engines and interiors set the pace of every rate increase.
  • MRO turn times keep stretching as fleets fly longer, used serviceable material runs short and experienced technicians retire.
  • Fixed-price development and production contracts are absorbing cost growth that the original bid never priced.
  • Quality escapes and traveled work push defects downstream, where every fix costs more and draws customer and regulator scrutiny.
  • Programs report green until late, because schedule, earned value and supplier risk live in separate systems and separate meetings.

How we help

Six services our aerospace and defense consulting team brings to the sector, each delivered by people who have worked inside its quality systems.

Supply base stabilization

Map sub-tier risk part by part, put supplier development teams at the constraints and agree recovery plans that buyer and supplier both sign.

Production rate readiness

Line balancing, capacity modeling and first-time-quality work that prepares a factory for the next rate step before the schedule demands it.

MRO turn time reduction

Induction planning, parts kitting and shop flow redesigned around the engine or component, so turn time falls without adding bays or headcount.

Program execution and recovery

Integrated schedules, earned value discipline and risk burn-down that show the true state of a program early enough to act.

Quality and escape reduction

Root cause analysis, 8D and statistical process control on the defects that drive traveled work, nonconformance cost and customer findings.

Should-cost and supplier negotiation

Clean-sheet cost models and fact-based negotiations for long-term agreements, escalation clauses and single-source parts.

Client impact

Results from regulated, asset-intensive operations with the same reliability and quality demands as aerospace. Clients are not named.

950+

global positions consolidated

Aerospace and defense

Simplifying two decades of organic growth

A $87B aerospace and defense contractor eliminated more than 7,000 waste and bottleneck problems and consolidated three manufacturing centers into one lower-cost location.

3 months

to a working consolidation strategy

Aerospace and defense

Post-merger savings after $18M spent elsewhere

Three years after two acquisitions, a $44B contractor still lacked the savings. WGA simplified processes, merged overlapping systems and consolidated service offerings across international operations.

6 weeks

to a 2030 strategy roadmap

Aerospace and defense

A strategy roadmap while partners waited

The usual supplier quoted a three-month wait. WGA had a team on the ground at a $95B aerospace and defense manufacturer in two days and unblocked supply partner commitments.

AI in aerospace and defense

Agents that find the shortage before it stops the line

Most aerospace delays are visible weeks ahead in purchase orders, supplier commitments and shop-floor data. Nobody has the hours to read all of it.

WGA designs AI agents that watch sub-tier signals, draft expedite and recovery actions for buyers and assemble MRO work packages for planners to approve. Engineers and inspectors keep every airworthiness decision, and controlled technical data stays inside your environment.

  • Shortage sensing across purchase orders, supplier commitments and receiving data
  • Agent-drafted nonconformance reports and 8D documentation for quality engineer review
  • MRO induction planning that matches work scope, parts availability and technician skills

Our experts

Frequently asked questions about aerospace and defense consulting

Do you work on defense and export-controlled programs?

Yes. We work inside your controlled environments and follow your export control and data handling rules, including keeping technical data on your systems. Staffing for export-controlled or classified work is agreed program by program. Confidentiality by default is one of our nine public commitments.

How quickly can you help a supplier that is missing deliveries?

A recovery diagnostic at the constraint supplier produces a part-level recovery plan within weeks, not months. Supplier development specialists then work on site until the plan is holding. We agree the scope and a fixed fee before work starts.

How do you reduce MRO turn time without adding capacity?

Most turn time is waiting: for parts, for inspection, for engineering disposition or for a bay. We map the flow of each engine or component, remove the waits and plan induction around parts availability. Capacity is added only where a real constraint remains.

How is the fee structured?

Every engagement has a fixed, transparent fee agreed before work starts, tied to a defined scope and the outcomes we commit to. We do not bill by the hour, so our incentive is to finish the work, not extend it.

How do you measure results on an aerospace and defense consulting engagement?

We baseline the metrics your customers and your P&L care about: on-time delivery, turn time, cost of poor quality and earned value indices. Finance confirms the baseline, and we report against it until the gains hold.

Related insights

Article · September 21, 2026

AI agents in the supply chain, from sensing to settlement

The supply chain runs on exceptions, and exceptions are where AI agents earn their keep. Where agents fit, from sensing to settlement, and how to sequence.

Article · September 23, 2026

Why transformations stall, and what restarts them

70 percent of large transformations miss their goals, and most stall in recognizable ways. The patterns to look for, and the restart moves that work.

Article · September 22, 2026

AI in pharma quality: meeting the credibility bar

FDA’s draft guidance sets a risk-based credibility bar for AI in pharma quality decisions. What that means for quality operations that want agents.

Talk to our aerospace and defense team

Tell us where the program, the supply base or the hangar is falling behind. A senior consultant, not a sales team, will reply.