Case Study: Pharmaceutical Maintenance Excellence with RCP

Four sterile pharmaceutical plants in North America and Puerto Rico faced repeated supply disruptions caused by maintenance and spare part failures. We stabilized operations and built a three-year maintenance excellence strategy that lifted equipment uptime from 42-51% to 74-81%.

At a glance
IndustryPharmaceuticals
ClientPharmaceutical manufacturer with four sterile manufacturing plants
RegionNorth America and Puerto Rico
CapabilitiesMaintenance excellence, Operational stabilization, RCP benchmarking, Leadership and culture
StatusCompleted

The challenge

The client was experiencing unexpected and avoidable supply disruptions at four sterile pharmaceutical manufacturing plants in North America and Puerto Rico. A series of root cause workshops traced the disruptions to cascading facility system failures and chronic equipment downtime.

Those failures pointed to deeper flaws in how the plants managed preventive maintenance and spare part inventory. The client needed to protect customer service immediately, and it also needed a long-term fix for the system that had allowed the failures to build up.

Any plan therefore had to deliver quick relief at each plant without losing sight of the structural changes needed across the whole network.

Our approach

Balance urgent needs with long-term change

Working with the client's regional leadership, our team shaped a three-part approach. First, triage each plant to stabilize customer service levels. Second, run an RCP benchmark to identify gaps and improvement actions. Third, define a single maintenance excellence strategy for all four plants.

Stabilize each plant

We sent triage teams to every plant to identify and prioritize stabilization countermeasures. This allowed production volumes to recover while the longer-term diagnostic work got under way. Stabilizing service first gave the client room to address root causes without adding pressure on customer supply.

Benchmark to find the gaps

In parallel, the RCP benchmark identified between 145 and 219 gaps per plant. The findings exposed clear policy and culture problems across every plant, not only isolated technical issues, which shaped how the remediation had to be designed.

Sequence remediation over three years

We worked with the client to prioritize remediation plans, separating actions specific to one plant from those affecting all four. Given the severity and scale of the gaps, the strategy was structured over three years to allow time to deploy improvements and to develop and train staff. By 2014, two years into the strategy, the plants had achieved the results below.

Results

  • Unified maintenance policies, organizational changes and preventive maintenance improvements adopted at all sites
  • End-of-life environmental systems replaced through capital investment
  • Planned preventive maintenance work increased from 35% to 94%
  • Equipment uptime (OEE2) improved from 42-51% to 74-81%
  • TMC/ERV reduced from 13.8% to 6.9%, and monthly maintenance backlogs cut by 87%
  • Annual labor cost as a share of TMC reduced from 31% to 19%

Why it matters

Recurring supply disruptions are usually a symptom rather than the underlying problem. In this case, the fix required both immediate stabilization and a multi-year program that addressed policy, culture and skills together. Executives facing similar pressures should resist choosing between firefighting and strategy, because durable results come from doing both at once.

Related capabilities

Discuss a similar challenge

To talk through a situation like this one with a WGA Consulting partner, please complete the form below or call us toll-free at (866) 556-5206.

About the author

Executive Managing Director, WGA Consulting

Paul Johnson has over 30 years of experience leading business transformation, organizational development, and strategic initiatives across industries. His expertise spans management consulting, change management, and financial analysis, enabling him to craft and implement strategies that deliver measurable and sustainable results.